Coal delivery from the mine to the port uses a 30 ton dump truck. MME carries out coal loading activities at 2 ports, namely, RMK Energy (RMKE) port and Swarnadwipa Pier Port. MME also collaborates with PT Kereta Api Indonesia (KAI) to transport coal from the location.
Each port has 3 jetties with jetty facilities that can accept barges measuring 310 feet (considering the height of the Ampera Bridge) and the maximum departure draft is 4.5 meters. Coal loading speed at RMKE port.